Link to NASA Agency Website
NASA-NEPP Logo - Click to return to the NEPP Home Page    + View the NASA Portal
NEPP Website Search  
Powered By Google
Link to the NEPAG Home Page Link to the Photonics Page Link to the NEPP Parts Page Link to the NEPP Packaging Page Link to the NEPP Radiation Page Link to the DC/DC Converters Page Link to the NASA Parts Selection List
Link to the NASA Technical Standards Server Link to the NASA Workmanship Website Link to the Wirebond Website Link to the Tin Whiskers Home Page Link to the Plastic Encapsulated Microcircuits Page Link to the NEPP Publications Search Link to the NEPP Experts Page Link to the NEPP Calendar
Your Path: Home » Events Calendar » Xilinx June 2007 Status Meeting
  Reliability Analysis Center (RAC)
  2007 NEPP Workshop
Xilinx June 2007 Status Meeting
  Search
 
 
 
 
Xilinx June 2007 Status Meeting
Xilinx Aerospace Status - June 2007
Presenter Organization Briefing Title Time Start
         
Jeff Kalb SNL Meeting Welcome, Logistics, and Session Rules 15 8:30 AM
Jeff Wetch Xilinx Update on current Xilinx RT offerings and future RT roadmap (including V-flow) 15 8:45 AM
Christian Poivey NASA Single Event Effect Characterization of XC4VF60 Xilinx FPGA 20 9:00 AM
Greg Allen NASA-JPL Initial Upset Measurements on a Virtex-4 FPGA incorporating 90nm Features and a Thin Epitaxial Layer 20 9:20 AM
Grant Smith Honeywell Enhanced Fault Tolerance for On-Board FPGA Based Reconfigurable Computing 20 10:00 AM
Ray Bietry NASA SpaceCube 30 10:20 AM
Jeff Wetch Xilinx Update on XTMR status and known planned flight design-ins 20 10:50 AM
David Czajkowski Space Micro TMR and H-Core Applied to Reconfigurable FPGAs to Improve Radiation Performance 20 11:10 AM
Heather Quinn LANL Limitations in Single-Chip Triple Modular Redundancy 40 11:30 AM
   

Lunch & Informal Discussions with the Authors

65 12:10 PM
Kevin Warren Vanderbilt On-Orbit Soft Error Rate Calculations for the 12T RHBD Static Latch (90nm) 30 1:15 PM
Gary Swift Xilinx Update on JPL on work on-orbit upset calculations (65nm) 30 1:45 PM
Melanie Berg NASA Complex Testing 30 2:15 PM
Joe Fabula Xilinx Update and the SIRF Program and the SIRF Rad Test Results 25 2:45 PM
David Alexander AFRL Preliminary Virtex-4 Dose Rate Data 20 3:10 PM
David Wick Honeywell Proven FPGA to Rad-Hard ASIC Capability 20 3:30 PM
All   General Discussion and Q&A with the Authors 40 3:50 PM
         
Privacy Policy and Important Notices NEPP Help for Site Navigation NEPP Feedback Form Link to the NEPP Site Map
USA.gov  
NASA Logo - Click to visit the NASA Agency Website
NEPP Program Manager: Michael J. Sampson
Responsible NASA Official: Michael J. Sampson
Webmaster: Carl M. Szabo, Jr.
      Last Updated: August 20, 2008